Comparison

OEM vs ODM Explained

OEM vs ODM: OEM = Sie entwerfen, wir fertigen. ODM = wir entwerfen, Sie markenneu. Kexin unterstützt beides ab 500 Stück MOQ. OEM 12-16 Wochen. ODM 4-6 Wochen.

OEM vs ODM Explained

OEM vs ODM Explained: Overview

OEM vs ODM: OEM = Sie entwerfen, wir fertigen. ODM = wir entwerfen, Sie markenneu. Kexin unterstützt beides ab 500 Stück MOQ. OEM 12-16 Wochen. ODM 4-6 Wochen.

Specifications

MaterialPP / ABS / PC / Aluminum
Lead time30–45 days
Minimum order quantity500 pieces
OriginGuangdong, China
CertificatesCE / RoHS / REACH / ISO 9001 / BSCI

Features

  • IP67/IP68 waterproof and dustproof (optional IP68 to 5 m depth)
  • MIL-STD-810H drop and shock resistance, 26+ drops from 1.2 m
  • Custom CNC-cut foam insert tailored to your device
  • Pantone-matched colour from 500-piece MOQ
  • TSA lock, pressure-equalization valve, O-ring seal
  • EXW Guangdong factory or FOB Shenzhen / Ningbo, 30–45 day lead time

Applications

The OEM vs ODM Explained is used across many industries: industrial, photography, drone, defense, medical, rescue, radio, surveying, marine and more. OEM/ODM customization is standard.

Frequently asked questions

Which fits my business?

ODM is faster and lower risk (use our 200+ tooled designs). OEM is for unique product, IP ownership, or major brand programs. Kexin engineers both paths.

What certifications and industries are OEM vs ODM Explained suited for?

CE, RoHS 2/3, REACH, ISO 9001:2015, BSCI audited. IP67/IP68 test reports and MIL-STD-810H on request. Common B2B industries: competitive positioning — buyers comparing OEM case brands for B2B procurement.

Lead time and shipping terms for OEM vs ODM Explained?

30-45 working days after artwork approval. We ship EXW Guangdong factory or FOB Shenzhen / Ningbo. Sea freight 25-30 days to EU, 18-22 days to US West Coast, 12-18 days to Southeast Asia. Air freight on request. Customer arranges import customs and last-mile.

What is the MOQ for OEM vs ODM Explained? Can I customize logo and color?

MOQ starts at 500 pieces for custom Pantone in-mould color and logo. Heat-stamp logo available from 100 pieces. Sample lead time 7-10 days, bulk 30-45 days after artwork approval. EXW Guangdong factory or FOB Shenzhen / Ningbo. T/T 30/70 standard. We do not offer DDP or overseas warehouse.

Ready to manufacture your protective case?

Get a free quote and reply within 24 hours on business days. 500-piece MOQ.

Request a Quote